Icons to represent Foreign Exchange Order Types

Great Experience!!!

$384 paid

21 custom designs

9pre-qualified designers

Learn more about Icon Design Contest

Winning design #8 by meedo, Icon Design for Icons to represent Foreign Exchange Order Types Contest
Gold Medal

designed by meedo

Project description

The contest is to design a series(6) of 20x20 pixel icons to represent the various foreign exchange trading order types. The following is a description of the different order types: 1) Market Order - An order used to enter the market at the current price. 2) Entry Order - An order used to enter the market at a future price. 3) Limit Order - An order used to close a position when profit level is reached. 4) Stop Order - And order used to close a position when a loss level is reached. 5) Close Order - An order used to close a position at the current market price. 6) Hedge Order - An order used to open a position in the opposite direction of the order being hedged. I'm looking for color images on a transparent background. Thank You !

Read full brief

Comments

  • 20px x 20px ... would you prefer to see bigger examples that can be resized to 20x20?
    • I would prefer to see the entries published at a size of 20px x 20px.

  • Hi CH, I have submitted a design #2. Please check the design and give feedback. Thank You
    • |--|

      sumesh {*wrote*}:
      Hi CH, I have submitted a design #2. Please check the design and give feedback. Thank You
      |--| sumesh, Thank you for your submission. I like the design, however, to be considered, I need to see how the images will look @ 20px x 20px.

  • Hello tabExplorer, I'm just wondering what type of application these icons will be used on e.g software program, web/mobile app, etc. Thank-you
    • The application is a windows desktop application and the icons will be used in menu items and command bar buttons.

  • Hello, I submitted #1 for your consideration. The icons are 20X20 px, and I used different colors and simple content so it will be seen clearly in this size. Your feedback would be appreciated. Thanks!
  • cancel comment
  • Dear CH, I've uploaded my design- #6. Please let me know if you have comments or suggestions for my design, so that I can improve it for you. Thanks & Cheers
  • About #5 feedback would be very helpful to see if you do like my design or need improvement. Thank you
    • I do like the design but did specify in the Brief that the images use a transparent background.

    • I apologies i missed that part, here is my second entry #16 , same design just a bit of changes with a transparent background. Hope you like it. Thank you.

  • Please submit 20px x 20px images and remove borders.
  • Using #7
    • Please see my design #13 AND GIVE SOME COMMENT FOR IMPROVEMENTS THANK!!

  • hi ch submitted design #3 #4 #10 and #11 a feedback would be great thanks
  • This design is too biased towards the US Dollar.
  • I'm eliminating this in favor of your #8 submission since that design is on a transparent background as requested.
  • What about #14 sir? Any suggestion to make it better? Thank you :)
    • Use a blue color in place of the green and red for MARKET ORDER, ENTRY ORDER, CLOSE ORDER, AND HEDGE ORDER. Also, remove x and y axis.

    • Left - Revised as your command sir :) Right - Same as left one but with simply arrow chart. I've try to make it clear to read because the size is very small Feel free to give me direction :D